8 TIMES more resistant
to hail compared to market standards.
3 TIMES more robust
against accidental impacts and capable of withstanding a snow load up to 750 kg/m².
Join the energy transition with the national CER TORRI.
With TORRI’s Made in Italy solar panels. Be part of the energy transition with TORRI national CER. With TORRI Made in Italy photovoltaic modules. BEYOND ORDINARY SOLAR, Topcon technology, PRISMA 4.0, and cell efficiency greater than 24.8%, you can access the non-repayable grant provided by the GSE call for tenders for systems up to 1 MW in municipalities with fewer than 50,000 inhabitants.
Thanks to the national CER Torri, you are entitled to a 40% non-repayable grant on your system if you live in a municipality with less than 50,000 inhabitants, as well as an extra incentive for energy sharing.
Request a quote directly from the factory or become part of our partner network.
The GSE call for Renewable Energy Communities (CER), funded under the PNRR (Mission 2, Component 2, Investment 1.2), aims to support the construction of plants for the production and shared self-consumption of energy from renewable sources. The initiative is designed to reduce fossil fuel consumption, promote energy independence, and encourage citizens to actively participate in the ecological transition.
The following may apply for incentives:
It is essential that the model be associative (non-commercial) and based on collective self-consumption and energy sharing.
The call for proposals provides for a non-repayable grant of up to 40% of eligible costs for the construction of the plants. In addition, there is an incentive tariff for shared energy, paid by the GSE for 20 years, which varies according to the size of the plant and its geographical location, with a greater advantage for disadvantaged areas or southern Italy. The non-repayable grant can be combined with other public incentives.
The systems must be powered by renewable sources (in particular photovoltaic), with a total power not exceeding 1 MW. Storage systems and smart energy management devices may also be included.
Expenses for supply, installation, connection to the grid, feasibility studies, design, and testing are eligible.
Initially aimed at municipalities with fewer than 5,000 inhabitants, the call for applications has been extended to municipalities with up to 30,000 inhabitants, broadening the potential pool of beneficiaries. Applications are expected to open following the publication of the dedicated GSE portal. The procedure will be on a first-come, first-served basis until the available resources are exhausted.
https://www.torri.solar/wp-content/uploads/2025/03/Decreto-CER.pdf
PRISMA 4.0 TECHNOLOGY is designed to protect the internal silicon circuit. The results achieved are extraordinary and unique.
to hail compared to market standards.
against accidental impacts and capable of withstanding a snow load up to 750 kg/m².
Take part in the national TORRI CER and access a non-repayable grant of up to 40% for photovoltaic systems and storage systems.
Renewable energy, cumulative incentives, shared value.
If you are an installer, become an authorized partner and use our products.
Ethics, community, and the environment.
These are the pillars on which our company is built, and through them we strive to make our own small contribution to society.